Deployment Checklist — Restoration Decision

Deployment Checklist — Restoration Decision

Historical decision; superseded by the worked example at docs/helix/05-deploy/deployment-checklist.md.

deployment-checklist is restored as the canonical deploy-activity artifact for technical release readiness and rollout go/no-go checks.

Decision

This artifact is restored rather than retired.

Current HELIX still requires docs/helix/05-deploy/deployment-checklist.md in the deploy exit gate and the iterate entry gate. monitoring-setup also treats it as a distinct input rather than a replacement. The intent therefore still exists in the live contract even though the original artifact stub was pruned.

Why It Exists

  • The deployment checklist is the short operational surface used to decide whether a release can start, continue, pause, or roll back.
  • monitoring-setup defines the observability configuration and alerting that the checklist must verify, but it is not itself the live go/no-go surface.
  • runbook explains how operators respond when rollout fails or an incident occurs, but it is broader and more procedural than the release checklist.
  • Release communication belongs in release-notes, and broader launch coordination belongs in linked activity:deploy tracker issues rather than the technical deployment checklist.

Canonical Inputs

  • build completion evidence and any blocking test or security gates
  • environment, secret, and migration readiness
  • staged rollout checkpoints and health checks
  • monitoring dashboards and alerts that prove safe rollout
  • rollback owner and rollback entrypoint

Minimum Prompt Bar

  • Keep the checklist service-specific and short enough to use live during a deployment.
  • Include only checks that materially change the release decision.
  • Require explicit verification signals or commands for rollout health.
  • Require explicit rollback triggers and the rollback entrypoint.
  • Link to monitoring setup and runbook instead of duplicating them.
  • Exclude broad cross-functional launch tasks that belong in separate artifacts.

Minimum Template Bar

  • release scope and owners
  • pre-deploy readiness checks
  • rollout sequence or staged rollout checkpoints
  • production verification checks with evidence
  • rollback triggers and responsible owner
  • final go/no-go decision record

Canonical Replacement Status

deployment-checklist is not replaced by monitoring-setup or runbook. Those artifacts define adjacent responsibilities that the checklist references. The deleted prompt and template were too thin, so restoration requires a real prompt and template bar rather than reintroducing the old stub verbatim.

The deleted launch-checklist artifact stays superseded rather than restored. Its surviving intent is intentionally decomposed: technical readiness lives in deployment-checklist, observability readiness lives in monitoring-setup, rollback and recovery procedures live in runbook, release communication lives in release-notes, and cross-functional coordination lives in linked activity:deploy tracker issues. Reintroducing launch-checklist would duplicate those surfaces instead of defining a distinct deploy artifact.