Scope Discipline

Category: Quality Attributes · Areas: all

Description

Category

quality-attribute

Areas

all

Boundary

This concern is the scope gate: it refuses work that is the wrong size — either hollow (under-delivered but claimed done) or padded (over-delivered beyond what was requested). It is the methodology home for YAGNI / KISS / “do only what was asked”.

It composes with verification and does not duplicate it:

  • verification owns did it run — observed evidence that the built system works end-to-end.
  • scope-discipline owns is it the right size — the change delivers exactly what the governing acceptance criteria asked for, with no hollow placeholders standing in for unfinished work and no unrequested scope bolted on.

A change can pass verification (the happy path runs) and still fail scope-discipline (it shipped a stubbed branch, or it gold-plated three features nobody asked for). Both gates are required.

Components

  • No hollow completeness: the path the acceptance criteria exercise contains no stubs, TODO/FIXME-as-work-marker, unimplemented!()/panic!("not implemented")/NotImplementedError, empty handler bodies, or “facade” wrappers with nothing behind them.
  • No gold-plating: no feature, abstraction, configuration surface, or refactor the work item did not request — built because it “might be useful” or “while we’re here”.
  • No pre-release legacy shims: backward-compat aliases, fallbacks, and deprecation shims are not added for consumers that do not exist yet.
  • Bounded blast radius: the change touches the files the work item scopes, not an incidental codemod sweep across the tree.
  • Recorded scope: what is in scope and what is explicitly a non-goal is written down, so “done” is measured against a stated boundary, not a mood.

Constraints

Build exactly what was requested — no less

  • A work item is not done when the path its acceptance criteria exercise still contains an incompleteness marker (stub, unimplemented!, TODO/FIXME describing unfinished behavior, empty body returning a placeholder). Hollow completeness — code that compiles and a unit asserts the stub — is the failure this catches.
  • “Facade”, “for now”, “placeholder”, “wire up later”, and “stubbed for the demo” describing shipped, done-claimed work are completion-honesty defects. Either finish the implementation, or leave the criterion honestly unsatisfied and tracked — never claim done over a placeholder.

Build exactly what was requested — no more

  • Do not add features, options, abstraction layers, or configuration the governing acceptance criteria did not ask for. Speculative generality is scope the operator did not approve; it is removed, not justified after the fact.
  • Do not retreat from a requested capability under an unrequested constraint (e.g. shipping a flow read-only “for security” when the AC requires writes). A capability the AC requires is in scope; narrowing it is a scope change that needs an explicit, recorded tradeoff — not a silent default.
  • Pre-release software has no released consumers: do not add legacy-compatibility shims, aliases, or fallbacks “to be safe”. Cut the old path in the same change that introduces the new one.

Bounded blast radius

  • The diff is scoped to the work item. A change that rewrites or sweeps files outside the item’s stated scope (a tree-wide sed, an opportunistic rename) is reverted to scope; the off-scope edit becomes its own tracked item if it is worth doing.

Exceptions (honored in concern-resolution and at the gate)

Phased delivery is legitimate when it is recorded, not improvised:

  • Explicitly phased placeholder — a stub is acceptable only when it is (1) named in the implementation plan as a deliberate phase boundary, (2) tracked by a follow-up work item, and (3) not covered by an acceptance criterion that is claimed satisfied. An unrecorded stub on a done-claimed path is a defect, not a phase.
  • Requested scope reduction — narrowing a capability is allowed when the operator requested it or an acceptance constraint forces it, and the reduction is recorded (in concerns.md / an ADR) with its reason. An unrecorded “I made it read-only for safety” is not an exception.

A recorded exception relaxes what is in scope, never the honesty rule: a placeholder is never reported as a satisfied criterion.

Drift Signals (anti-patterns to reject in review)

  • Stub / unimplemented!() / TODO-as-unfinished-work on a path an acceptance criterion claims to satisfy → hollow completeness; finish it or stop claiming done.
  • “facade” / “for now” / “placeholder” / “wire up later” describing shipped work → completion-honesty defect; finish or track-and-don’t-claim.
  • A legacy-compat alias, fallback, or shim added with no released consumer → pre-release gold-plating; cut it and the old path together.
  • A feature, option, or abstraction the acceptance criteria never asked for → YAGNI violation; remove it.
  • A requested capability shipped disabled / read-only “for security” with no recorded tradeoff → unrequested scope retreat; restore it or record the change.
  • A diff that edits files outside the work item’s stated scope (tree-wide sweep, drive-by rename) → blast-radius; revert to scope.

When to use

Every buildable implementation work item, regardless of language, framework, or domain. High autonomy auto-selects this concern for buildable products (see workflows/references/concern-resolution.md), honoring the exceptions above. Compose with verification (evidence that it runs) — scope-discipline adds the size gate on top; it does not replace verification’s evidence requirement.

Artifact Impact

Selecting this concern requires these artifacts to change (a selected concern absent from them is drift):

  • IMPLEMENTATION_PLAN: the scope boundary — what is in scope, and the explicit non-goals the change must not build
  • TEST_PLAN: no acceptance criterion is satisfied by a stubbed / placeholder path; incompleteness markers on AC-exercised code are a blocking finding
  • ADR: any recorded exception (explicitly phased placeholder, or requested scope reduction) and its reason

ADR References

Practices by activity

Agents working in any of these activities inherit the practices below through runtime work context, such as a DDx bead context digest.

These practices define the scope gate: the change is the right size — neither hollow (a placeholder claimed done) nor padded (scope nobody requested). They sit beside verification (which proves the system runs) and do not restate it.

Design

  • State the scope boundary for the work item before building: the capabilities the acceptance criteria require (in scope) and the explicit non-goals the change must not build. Record it in the implementation plan.
  • If a phase boundary is genuinely needed (a deliberate stub with a follow-up item), name it now — which path is phased, which follow-up item tracks it, and which acceptance criteria it does not satisfy.

Implementation

  • Build to the acceptance criteria — not short of them, not past them.
  • No incompleteness marker on a path an acceptance criterion exercises: no stub, no unimplemented!() / panic!("not implemented") / NotImplementedError, no TODO/FIXME standing in for unfinished behavior, no empty body returning a placeholder.
  • No unrequested scope: do not add a feature, option, abstraction layer, or configuration surface the criteria did not ask for. “Might be useful later” is a follow-up item, not this change.
  • Pre-release: cut the old path in the same change that replaces it. Do not add backward-compat aliases, fallbacks, or deprecation shims for consumers that do not exist yet.
  • Keep the diff scoped to the work item. If a tree-wide fix is warranted, file it as its own item rather than sweeping it in.

The scope gate (before claiming “done”)

A completion claim is incomplete if any of these hold:

  1. Hollow path — a path covered by a satisfied-claimed acceptance criterion contains an incompleteness marker. Resolve by finishing it, or by leaving the criterion honestly unsatisfied and tracked (never both done and stubbed).
  2. Unrequested scope — the change builds a feature, option, or abstraction no acceptance criterion asked for. Resolve by removing it (or filing it as its own governed item if it is worth doing).
  3. Unrecorded scope reduction — a requested capability shipped narrowed (disabled, read-only) with no recorded tradeoff. Resolve by restoring it or recording the reduction in concerns.md / an ADR.
  4. Off-scope blast radius — the diff edits files outside the work item’s stated scope. Resolve by reverting the off-scope edits.

Phased placeholders and requested scope reductions are allowed only as the recorded exceptions in concern.md — a named stub with a tracked follow-up item that no satisfied criterion depends on, or a scope reduction with a written reason. An unrecorded stub or silent narrowing is a defect, not a phase.

Verify against the boundary, don’t trust the summary

This is the verification concern’s verify-don’t-trust rule applied to size rather than behavior: verification asks whether the stack ran; scope-discipline asks whether the change is the right size.

  • An autonomous pass will describe its own output as “complete”. Check the diff against the stated scope boundary rather than trusting the summary: does every satisfied criterion run real code, and did the change build only what was asked?
  • Words the change uses about itself — “facade”, “for now”, “placeholder”, “stubbed”, “wire up later” — are signals to inspect the path, not to accept.

Quality Gates

  • Zero incompleteness markers (stub / unimplemented! / unfinished-TODO / placeholder body) on paths that satisfied acceptance criteria exercise — or a recorded phased-placeholder exception covering each.
  • Zero unrequested features, options, or abstraction surfaces beyond the acceptance criteria.
  • No pre-release legacy-compat shim, alias, or fallback without a released consumer.
  • The change’s diff is contained to the work item’s stated scope.